Railways Increase Maximum Speed to 100 kmph on Katra-Banihal Section of USBRL
On 19 August 2026, the Indian Ministry of Railways approved an increase in the maximum permissible speed from 85/75 kmph to 100 kmph on the 111-km broad gauge Katra-Banihal railway section in Jammu & Kashmir. This section is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a major infrastructure project enhancing connectivity in the region. It features 33 tunnels covering 87% of the route and notable engineering structures including the Chenab Railway Bridge and the Anji Khad Bridge. The speed increase is expected to reduce travel time and boost tourism and trade.
On this page

Key Facts
- On 19 August 2026, the Indian Ministry of Railways approved a maximum permissible speed of 100 kmph on the 111-km Katra-Banihal broad gauge section under Northern Railway's Jammu Division.
- This section is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), a strategic project connecting Jammu and Kashmir.
- The Katra-Banihal stretch includes 33 tunnels covering approximately 87% of the route and significant engineering structures such as the Chenab Railway Bridge and Anji Khad Bridge.
- Previously, the maximum permissible speeds were 85 kmph between Katra and Sangaldan and 75 kmph between Sangaldan and Banihal.
- High-speed trial runs on this section reached a peak test speed of 110 kmph on 8 January 2025.
- Safety and infrastructural audits preceded the speed increase approval to ensure compliance with all prescribed safety standards.
Background & Context
The Udhampur-Srinagar-Baramulla Rail Link (USBRL) is India's ambitious railway project aimed at connecting the Kashmir Valley with Jammu and the rest of India through modern rail infrastructure across challenging Himalayan terrain. The Katra-Banihal section is a critical 111-km stretch featuring complex engineering challenges such as numerous tunnels and world-class bridges. Enhancing permissible speeds along this section represents a significant step toward operational efficiency and improving travel experience for passengers.
Why This Matters for Exams / Exam Relevance
This topic is important for competitive exams, especially those covering Indian geography, infrastructure projects, and developmental initiatives. Test questions may address the USBRL project specifics including key dates, locations, engineering feats, speed limits, and impacts on regional connectivity and socio-economic development.
Points to Remember
- The Katra-Banihal railway section is 111 km long under Northern Railway's Jammu Division.
- The permissible speed increase to 100 kmph was approved on 19 August 2026.
- The section’s features include 33 tunnels and iconic bridges such as the Chenab Railway Bridge and Anji Khad Bridge.
- High-speed trials recorded a maximum speed of 110 kmph on 8 January 2025.
- The upgrade aims to reduce travel time and support tourism and trade enhancement in Jammu and Kashmir.
Sources & Further Reading
| Document / Website | Link |
|---|---|
| Trains to Run at 100 kmph on Katra-Banihal Section | Open Trains to Run at 100 kmph on Katra-Banihal Section ↗www.gktoday.in |
| Katra-Banihal rail section speed limit increased to 100 Kmph | Open Katra-Banihal rail section speed limit increased to 100 Kmph ↗earthnews.in |
| Rail Renaissance in Jammu and Kashmir | Open Rail Renaissance in Jammu and Kashmir ↗www.pib.gov.in |